Successful Projects

Image
Location: Samarkand region
Total capacity: 5020 kWp Scope of work: Working documentation; Supply and installation of equipment; Commissioning and testing Client: Solar panels: Jinko solar 580 W N type bifacial Inverter: Huawei SUN2000-330KTL-H2
Image
Location: Kyrgyz State University
Total power: 82 kWp Scope of Work: Full EPC (design, procurement, construction) Client: Solar panels: CW Enerji 545 W Inverters: Fronius 27 kW x 3
Image
Location: Kokand, Uzbekistan
Total capacity: 5020 kW DC Scope of work: Full EPC (design, procurement, construction) Solar Panels: JinkoSolar Tiger NEO JKM580N-72HL4 580 W Inverters: Huawei 330 kW - 15pcs
Image
Location: Tashkent, Uzbekistan
Total Power: 200 kWp Scope of work: Full EPC (design, procurement, construction) Client: Solar panels: JinkoSolar N type 570W Inverter: Huawei
Image
Location: Largest rooftop project in Kyrgyzstan
Total Power: 220 kWp Scope of work: Full EPC (design, procurement, construction) Client: T-energy LLP Solar panels: JinkoSolar P type 570 W Inverter: Growatt
Image
Location: Bukhara, Uzbekistan
Total capacity: 1000 kWp Scope of work: Full EPC Solar panels: Das Solar 565 W Inverter: Hopewind
Image
Location: Shymkent, Kazakhstan
Total Power: 690 kW DC Scope of work: Full EPC (design, procurement, construction) Client: Solar panels: JinkoSolar N type 610 W Inverter: Huawei
Image
Installation of meteorological masts for wind measurement in Minbulak, Uzbekistan
Project Description: Installation of 4 meteorological masts and 1 lidar for the planned 1 GW Masdar project. Scope of Work: Supply, installation and commissioning of4 x 120 m meteorological masts and 1 ZX300 lidar Project Audit: Project and client:
Image
Location: Tashkent, Uzbekistan
Total Power: 135 kWh / 50 kW Scope of Work: Full EPC (engineering, procurement, construction) Client: Battery Energy Storage Systems (BESS): JinkoSolar
Image
Analysis of connection of a 50 MW wind farm to the 220 kV grid of Astana REC JSC
Investigation of wind farm integration into the power system Modeling in DigSILENT Verification of compliance with local grid codes Selection of electrical equipment Calculation of flow regimes and calculation of static and dynamic stability
Image
Studies of the national power system of Kazakhstan
Feasibility study of strengthening the southern power system of Kazakhstan Feasibility study of connecting the western power system to the national power system of KazakhstanFeasibility study of constructing a high voltage direct current (HVDC) line to connect the northern and southern parts of the national power system of Kazakhstan. Determination of available capacity in the national energy system to connect a 200 MW wind farm