Analysis of connection of a 50 MW wind farm to the 220 kV grid of Astana REC JSC

Analysis of connection of a 50 MW wind farm to the 220 kV grid of Astana REC JSC


Investigation of wind farm integration into the power system

Modeling in DigSILENT

Verification of compliance with local grid codes

Selection of electrical equipment

Calculation of flow regimes and calculation of static and dynamic stability

Connection of a 50 MW wind power plant in Zhungarskiye Vorota

Creation of a grid model based on the latest data at maximum and minimum load of the system

Building a wind farm model based on Goldwind wind turbines

Power flow analysisVoltage levels and overload analysis  

Report and recommendations

Image